Triton 47

Triton 47 › Making & hardware › The maker turn

Day 2,3,4-5,6-7 of Arctos Build

· 65 words · 1 min read

Index note photo log

Day 6-7 (day and night) mechanical assembly bare minimum

after Day 4-5, it was

After day 4

After day 3

after day 2

After day 1

Next steps:

plan is to use bare minimum CAN interface with each stepper, let see how simple I can get it by using chatgpt, if it would work, first I have to get the wires soldered and connected right.

Original: https://triton7777.wordpress.com/2024/12/24/day-234-56-7-of-arctos-build/